In our Monday seminars a couple of weeks ago, Caroline Parsons suggested we get some production schedules done for next semester. I have been reading a production design book by Hans Bacher called Dream Worlds: Production Design for Animation which had this really helpful graph roughly plotting the production pipeline for an animated feature made in 18 months.
I used this as a template to make my own production pipeline, but condensed it to a 9 month schedule for my film.
It took a lot longer than I originally thought, but it is much more detailed than the pipeline and goes from the start of year in September, right through to our deadline in May.
I know you wrote this a long time ago but I found this when I was looking up production schedules to get some inspiration. Your post helped me out a lot. This is all super cool and it inspires me to put a lot of work into my planning. Thank you for the inspiration!
ReplyDeleteThank you! I still use these kind of schedules to this day so they are still very much relevant. :) I'm glad it was of use to you, all the best for your animation! :)
ReplyDelete